on 10-06-2015 9:23 AM
Hello ,
My client requirement is to transfer the result for the lot currently lying in one plant to a lot in another plant .
My thinking is that the data will be downloaded from QASR table for the lots and then will be uploaded in another plant .
But still I am not sure how I am going to handle this requirement .
Please guide .
Regards ,
Sujit Prasad
Hi Sujit,
With our client we have catered to the requirement with ABAP development, where we have used the concept of covering lot through which result in multiple lots can be copied.
We record result in the covering lot and their after the same is copied into the other lot in following 2 ways
1. Those lot which satisfy our conditions are auto updated through back ground job.
2. We manually select lots in which results are to be copied from covering lot.
Regards,
Mukesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.