on 10-15-2015 8:23 PM
Hi everyone. I have some questions with the schedule theme from CMC. I have an user that created some schedules for some reports. The user was deactivated from SAP BW and the CMC, but the schedules are active. Can i pass the administration of those schedules to another user without create it from zero?
Sorry for my english. Regards.
Hi,
in this case you can select the existing recurring job->reschedule->select the option replace existing schedule under the replace.
I don't think so you can change the owner without updating the recurring jobs.to avoid these situations in future either schedule these one from administrator account or create some system users specfic to scheduling.
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amit. I talk about that the schedule that is running was created by one user that was deactivated. That user, put a remitent direction email that i want change. I don't know if making the reschedule take that changes and only will send one mail message from the changes that i make. Thank you very much.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.