Dear All,
We have Storage location 115000 Mumbai & are using for purchase & sales, till date we ware using manual planning for this location.
Current Material planning setting for any product is as below
We want to update below tabs by using Material Migration Template
but when i update these data using migration template, system gives below error for all products
"similar entry already exist for supply planning area for product XYZ"
Please let me know how to get away from this error
Regards
Vishal
Hi Vishal,
From your message i can see that you are uploading planning details for the materials that is already created in the system. If my understanding is rite, then system is behaving as designed.
Solution
Kindly select all the materials that you want to upload the planning details using shift button and then click "Mass Update". There you can change as per your requirement.
I have added the screen shot below for your reference. Kindly check and let me know for further clarifications
Regards,
Paarthiban
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Paarthiban,
As per my understanding, Mass update is for updating selected materials for a similar change (as you displayed above)
In my case, i have almost 11000 material with different Planning procedure, Lead Time, Safety Stock etc (parameters listed in my first message).
it is not possible to select material based on their planning & use Mass Update.
Many thanks for reply.
Regards, Vishal Kambare.
Hi Vishal,
please have a look at the Mass Data Maintenance work center. This is based on the migration work bench templates and allows to do mass changes. You have to first export a file for the products and aspect (e.g. planning aspect) you want to do mass changes for and then import the materials again with the file where the changes have been applied.
Best regards,
Stefan
Hi Vishal,
the purpose of the migration mode "Enhance already existing records" would here be to add a subrecord with planning information for new planning groups - under the prerequisites that there is no planning information for these groups yet.
If I understand correctly, this is not the situation that you have. In your case the planning information for the affected planning groups is already maintained, and you want to do a mass change for these entries. The right tool to perform this is, as Stefan correctly described, the Mass Data Maintenance workcenter (or the Mass Update as described by Paarthiban, while I understood that this does not meet your selection requirements).
Did you try the Mass Data Maintenance run?
Best regards
Michael
Hi Michael,
All products are maintained only with "Procurement Type" data in Material Master for location ID 115000
Below listed data is still blank in Material master for location ID 115000
I tried updating these records from migration activity with "Enhance already existing records"
but gave error.
I gave try for Mass Data Maintenance but faced error "Only files created in Mass Data Maintenance supported" hence couldn't go ahead.
Regards
Vishal
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.