i am confused in break down analysis because if i try use report iw38 and entered some parameter like (order type -equipment - period say from (01-2015-11-2015) it appears 2 order with status teco and the (breakdowns indicator was checked ) and if i try use report break down analysis (MCI7) and report (MCJB) it appear 1 order ???
asjad
If Start-up date is blank in Equipment master, the first Breakdown date is consumed as Start-up date. See this post. MTTR / MTBR / Breakdown Analysis Information System
Regards
KJogeswaraRao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You are asking already explained matter. System is not giving One Order. IW38 has given you both. For Information systems (PMIS), there is a need of Start-up date of Equipment as reference date from which the calculations are supposed to begin, which you are not providing. In such case the date of first Breakdown will be considered as the Start-up date of Equipment and then the PMIS reporting starts then onwards. So the date of first breakdown is consumed. Only one breakdown counts.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.