on 11-25-2015 10:30 PM
Hi Guys,
My simple requirement is to copy the component batch (1st line item in production order list) to header material batch number at production order release.
A long back I used one user exit for this. Can anyone help me to get the user exit name or any other way to solve this?
Thanks
Krish
No user exit but a BAdI, use workorder_update methode at_release.
Better way might be:
Use the batch user exit, if you set batch created while release, setting in production scheduling profile (OPKP) the system will call the batch functions while release, than the user exits from batch numbering / batch check will be called also. Customizing OCHA point batch numbers.
BR Sabine
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.