on 11-26-2015 5:40 AM
Dear All,
In one of my company code, there are 2 different plants 1001 and 1002. 1001 is using valuation stategy as "Valuation as per Tax price 1" where as 1002 using "Valuation using moving average price".
My requirement is I don't want to include both the strategy in a single costing variant. Since 1001 is the main plant and the line of business is different than 1002 and they don't want to change the strategy.
If I go for another costing variant system wont allow to release cost estimate using different costing estimate.
Even I had created ZAB1/AB1 costing/valuation variant for 1001 plant and ZAB2/AB2 Valuation variant for 1002. And also assigned Valuation variant / plant for 1002.
Even I had tried with transfer control in the ZAB1 costing variant. But system is not picking prices as per moving average price for 1002 plant when I use costing variant ZAB1.
Please help how can I achieve this with using single costing variants.
Regards
Bhaskar Basam
Dear Bhaskar,
you can do it by using Valuation Variant. Create two valuation variants and assign the relevant valuation variant to plants. The strategy of sequence for price determination can be maintained in valuation variant.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bhasker
You should use single costing variant across the company code. Your requirement can be fulfilled by using two valuation variant as already suggested by Ismail and Mr. Kamal.
You say that whiclr using two valuation variant you are getting some error. What is the error you are facing? Kindly share with us the detail screen shot of error.
Regards
Rajneesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Both,
As I mentioned in my first comment, I have created 2 valuation variants -
1) AB1 with "Valuation price according to Tax price 1"
2) AB2 with "Valuation price according to price control in material master"
I have assigned AB2 to this plant.
Also this material has price in the material master. So as per the setting, system should pick the prices from the material master, but system throwing the same error.
Regards
Bhaskar
Hi
I'm running cost estimate for material CROPKATRINA in plant F8FP and this has component CROPTEST. I'm using costing variant ZPC1 which was created for plant 1001 which I have assigned valuation variant Z01 - Valuation as per tax price 1.
I had created another valuation variant Z04 for plant F8FP to fetch the valuation as per price control in material master and also assigned this to valuation/plant setting.
Since there are 2 different plants under same company code and plant 1 user doesn't not want to include this valuation strategy under his valuation variant, hence I have created another valuation variant.
Please find the screen shots....
Hi
So I could understand that this is a component which is manufactured in house, since price control is 'S'. Am I right or wrong?
If right, Whether you have defined a BOM and routing for this material.
If yes, in your test system, kindly delete the cost of Rs. 150/- using CKR1 and try to cost the header material again.
Rajneesh