on 11-26-2015 10:25 AM
Hi
During costing run (CK40N) of Production version 2 of Material x, system is not considering the Co-product price from production version1 it is considering the Material Master Price.
We have Material X it has two production versions with Multiple BOM,
BOM 1 of X Material with production version 1
During costing run of production version Co-product cost is correctly (say 270) apportioned as per equivalent numbers as per production version 1.
BOM 2 of X Material with production version 2
During Costing run of production version 2 the input material (Material B) Price should fetch from production version i.e. 270 but not 350.
I have done the following setting Controlling and PP
Apportionment happening perfectly both main and co product.
But System is not considering the co product price from production version1,is fetch the value from Material Master during costing run of production version 2 of Material X.
Please suggest how to fetch price of CO product Material B from production version 1 in Production Version2.
Thank & Regards,
KISHORE
Hi
As Kamal Sir suggested, you need to first release the cost for production version 1 for material B then only system will considered 270 while calculating the the cost for version 2.
When you run the mix cost estimate of main material it will automatically mix the prices of version 1 and version based on ratio mentioned.
So as suggested by kamal sir, you need to first release the cost for co-product B
Regards
Bhaskar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bhaskar,
We can't choose production version in CK40N Transaction. Production version selection is available in CK11N.
In CK11N cost estimation will update only for Header material not for co-product.
I tried this option also but system is not updating the co-product cost after release.
Regards,
KISHORE
Hi SAP CO Experts..
Any updates on my issue.
Regards,
KISHORE
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kishore
In valuation variant sequence change the strategy
1. Standard price
2. MAP
3. Plan price
Also define Price control "S" for material B
kamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kishore
Input material price is always picking from valuation variant sequence..say here
either plan price
standard price updated in costing view 2
MAP
so costing result of mat B should update in costing 2 as standard cost for version 1 if mat B is defined as Price control S
Now tell me where your cost of Mat B 270 is updated
kamal
Hi Kamal,
Thanks for
Material B cost (270) is displaying in costing analysis in Production version 1 i.e before marking. The same will be updated in the Material Master after release.
Same Material B is my input material in production version 2 of Main Material A, my consumption price should be as per production version 1 of CO-product B. But system is not considering this price. it is considering the Material Master price.
Regards,
KISHORE
Hi Kamal,
We have Mixed costing also for the same Product A,. Mixed ratio is apportioned 60:40 ratio to production version 1 and production 2 respectively.
When we are running the cost estimate of Main material system is considering both Production version and deriving the cost of Main product after considering the apportionment and Mixed ratio.
Thanks & Regards,
KISHORE .
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.