SAP EH&S - QM Interface

Former Member
0 Kudos

Hello All,

Please help me if any documentation is available to create inspection plan from SAP EH&S. All the backend configurations were done correctly. We have added the characteristics in CGQM and mapped with QM characteristics. Once this is done we went to CG02 and click on Extras - QM Inspection plan creation. When checked in EHQL transaction and found that the Inspection plan is created. When we go and check in QP02 for that particular material, we were able to see the plan but not the characteristics in the Inspection characteristics.

Can any one please help us in creating the inspection plan through EH&S.

Thank you for the support

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member212503
Participant
0 Kudos

I was not even able to get inspection plan at all . how did you get inspection plan . What is the significance of maintaining cgqm .

Former Member
0 Kudos

Hello Gautam,

CGQM: This transaction is used to map the EHS characteristics with QM characteristics. For example we take color as one value assignment. Take the naming convention of that characteristic and maintain that in CGQM and map the characteristic value of the same color which is in QM.