on 04-22-2007 4:33 PM
Hi,
This is regarding transport queue. After importing the transports, we still see the imported transports in the queue with "yellow triagle". Is there any settings or any background job, which deletes these imported ones?
This likely pose problem, if anyone import it again.
Thanks,
Sam
Hi Sam,
If you place the mouse pointer over the yellow triangle if will show the staus as ` Request is ready for import again` . This status is displayed because before importing the transport request in to that system the request is imported with the option `Import transport request again`.
There is no automatic way to clear the TP requests in the queue. The unwanted TP requests can be deleted manually.
If you don`t want the TP request to be displayed in the queue after import Uncheck the first option `Leave transport request in the queue`. This will delete the TP request from the queue after first import.
Hope this clears your query.
regards,
Vinodh.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sam,
When you import the CTS, The status of the import is shown as either red,yellow or green.
Grey Diamond:Request is not yet transported
Red Square: Error durign Import
Yellow Triangle: Warning Import
Green Dot: Successful Import
Square with lightning symbol: Terminated transports
You can check the import history and find out what are the warnings for your imported CTS
Please find for more info on below link
http://help.sap.com/saphelp_47x200/helpdata/en/44/b4a3c57acc11d1899e0000e829fbbd/frameset.htm
**Reward points suitably for the answers
*Mark thread as solved if it has provided you the reply
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
81 | |
25 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.