O4NA - Open / assignment of new material

former_member301832
Participant
0 Kudos

Hi Guys,

I tried to open / assigning new material in transaction code O4NA, system throws an error as shown below

Materials in this tank: base UoM MT, UoM group API and conv.group 534B

    Message no. OC805

Diagnosis

    Multiple materials assignments require the same base unit of measure,

    and for oil materials, the same conversion group and unit of measure

    group for materials that are assigned at the same time.

System Response

    Only materials fulfilling the requirements are allowed for assignment.

Procedure

    A material which does not fulfill the requirement can be assigned to

    this tank after the assignment of the other materials is complete. So if

    the end date and time is open for the other materials, enter an end date

    and time, and assign the new material with a start date and time which

     is after or equal to the end date and time of  the other materials.

Further information: i checked in MMBE for the stock balance, yes stock balance is there in restricted use and On order stock.

Kindly help to resolve this issue.

Thanks in advance.

Regards,

Suri

1 ACCEPTED SOLUTION

Naresh_Jangam
Participant
0 Kudos

Dear Suri,

Please note that the system works as designed. For consistency reasons the application is designed to allow material assignments with same UoM group and Conversion group for all the materials.

Thanks,

Naresh.

View solution in original post

5 REPLIES 5

Naresh_Jangam
Participant
0 Kudos

Dear Suri,

Please note that the system works as designed. For consistency reasons the application is designed to allow material assignments with same UoM group and Conversion group for all the materials.

Thanks,

Naresh.

former_member301832
Participant
0 Kudos

Hi Naresh,

Thanks for immediate response.

As i am zero about IS-Oil and i am FICO consultant, can you please elaborate little more to understand.

I tried to update the UOM group & Conversion group in the material master, but system is not allowing.

UOM group & Conversion group cannot be changed because of stock posted.

Regards,

Suri

0 Kudos

Dear Suri,

For an OIL material, we need to maintain  Uom Group and Conversion group in MM03, Oil Specific view tab. It is not possible to assign materials having different UoM group or Conversion Group materials in one tank.
It is not possible to assign an OIL and non-oil material also in the same tank.

Thanks,

Naresh.

0 Kudos

Dear Naresh,

1. We are trying to assign Non Oil material and for this material in the material master there is no UOM and conversion group maintained.Also, i tried to maintain the same UOM & Conversion group anyhow it is not allowing.

2. This non oil material already assigned in the tank already in 2011 and ended in the same year. Now again user is trying to add this material now and getting the above error.

Can you please suggest me what steps i can follow to resolve the issue.

Thanks

Suri

0 Kudos

This message was moderated.