Dear Experts,

I am trying to explode the BoM in cj20n.

Have maintained REFERENCE material in external activity.

Also, done the  below mentioned steps.

You need to select the material from right screen.

1. In the left, click on Activity (BOM Explosion test)

2. In the right detail screen, click on component overview screen

3. Select the line item and do Edit - Component - Explode bom or Ctrl+F6

PLease advice.

Regards

Rohit

Accepted Solutions (0)

Answers (6)

Answers (6)

g_bf_singh
Discoverer
0 Kudos

Try going to Network Activity, then goto Component Overview, select the material and then click Edit Menu, Component, Explode BOM. This should resolve your issue.

Patelsa
Explorer
0 Kudos

Dear Friends,

Now i am planning to apply for SAP PS Certification could you please kind enough to share the EXAM Materials (PLM 210,235 & 240) (i have the rest of 2006 version hope this will be valid). my email is patelsajju@gmail.com.

and

C_TPLM22_67 - SAP Certified Application Associate - SAP Project Systems with SAP ERP 6.0 EHP7 is still the latest or any other latest is available kindly advise & tips to pass the exams (lot of fears & doubts)

Thanks a lot

0 Kudos

Hi Sunil,

Even after giving the quantity 1, in Purch Data, it is still not exploding in cj20n.

though in CN33 it is exploding.

I want it to explode in cj20n, please revert.

regards

Rohit

0 Kudos

Hi Experts,

Any input, why the BoM is exploding only through CN33.

My requirement is to Explode the BoM in CJ20n.

Awaiting for Inputs ASAP.

Thanks in advance.

Regards

Rohit

MTerence
Active Contributor
0 Kudos

Hi Rohit,

You cannot explode from CJ20N WBS overview screen, you can only do in Material overview in CJ20N

That is the standard

Regards

Terence

0 Kudos

Hi Maria,

I am clicking on Assigned material in actitivty and then going to EDIT-->Component --> Explode BoM (which is greyed out).

Am i doing anything wring here.

Regards

Rohit

MTerence
Active Contributor
0 Kudos

Hi Rohit,

Go to CJ20N

Click on the activity - Component Overview Icon

Then Edit - Component - Explode BOM

Regards

Terence

0 Kudos

Hi Terence,

I have already tried that as well but no luck.

Regards

Rohit

MTerence
Active Contributor
0 Kudos

Hi Rohit,

In such case, you need to check the authorization object

C_STUE_BER

C_STUE_WRK

May be this is restricting you

Regards

Terence

Former Member
0 Kudos

Hi Rohit,

lets look at route cause step by step, can you check for below first in material master:

1. Tab MRP1 MRP type is PD

2. Tab MRP2  check for Procurement Type not blank

3. MRP3 Strategy group is 21

4. MRP 4 Individual collective req to be 1

With all above try to run MRP in MD51 just to see BOM explodes or not.

If this happens then we check for issue in CJ20N.

Regards,

Pradeep

0 Kudos

Hi Pradeep,

Thanks for revert.

I tried the suggested steps and executed MD51.

Here No proposals are generated.

" No procurement proposals changed"

Even in Md01 the result is same.


Kindly advised.   

Regards

Rohit

Former Member
0 Kudos

Hi Rohit,

Can you try as said below, I hope it works (Simple):

1. Go to project said above.

2. Choose the NWA below which the BOM to be exploded.

3. Be in component overview tab of the NWA

4. Now go to Edit -> Component -> Explode BOM where you can choose BOM material or use same material that exist in component overview.

Let me know if it works, tried in my sys here is working fine.

Regards,

Pradeep

Former Member
0 Kudos

Hi Rohit,

Please confirm if the issue is been resolved.

Regards

Pradeep

0 Kudos

Hello Experts,

I have followed all the given inputs,  but the issue is still open.

please revert with some more inputs ASAP.

Regards

Rohit

virendra_pal
Active Contributor
0 Kudos

try with the same material with internal activity (control key PS01) and advise the results

Virendra

0 Kudos

Hi Virendra,

Tried the same as advised by you, Still no Luck.

Regards

Rohit

former_member388328
Active Contributor
0 Kudos

Hi Rohit,

1) select the Any activity in the project.

2) Click on component icon , Enter the Bom material , then goto edit on the top menu and  do explode bom. All the bom materials will assign to same activity.

If you still unable to explode , please check the your bom.

Thanking you

Vengaiah

0 Kudos

Hi Kuldeep, Sunil,

I have maintained the quantity in cs71.

If i am using CN33 IT is exploding from there.  But I want it to explode from the Project builder, cj20n,

Any inputs where i have missed out.

Any relevance of Project valuated stock or non valuated stock on this ??

Regards

Rohit

sunil_yadav2
Active Contributor
0 Kudos

Hi Rohit,

you have maintained quantity for BOM items but you have to give quantity to produce/explode so system will multiply the same with BOM items.

BOM header- Mat1

items - Mat 2 with quantity 2

than if you assign BOM header in activity without any quantity so how system calculate quantity for BOM Items to be processed.

thanks

Sunil

sunil_yadav2
Active Contributor
0 Kudos

Rohit,

where is quantity? for this material.

Former Member
0 Kudos

Hi Rohit,

Please define plan quantity & try same step by selecting material in table view of the activity.