cancel
Showing results for 
Search instead for 
Did you mean: 

Integrated Marketing Calendar Structure Change

Former Member
0 Kudos

Hi all,

We are using the Integrated Marketing Calendar in our TPM solution and are investigating whether it is possible to change the structure so it better meets the business requirements.

In the standard configuration, the Structure/View that is assigned in the configuration shows the Promotion ID down the vertical axis and time along the horizontal axis. What the business would like is to show promotions based on the product category referenced in the promotion instead of the promotion ID on the vertical axis. This way the user can see all the promotions related to an individual product category on an individual line.

Does anyone know whether it is possible to achieve this through the standard configuration or is whether it is feasible through an enhancement.


Thanks in advance


Paul


Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Paul,

you can check one of those BAdI in Customizing:

Giacomo