on 02-06-2016 11:23 AM
Dear Experts.
Client implementing S/4 HANA with simple fiance. AS SAP recommended using ACCOUNTING BASED COPA.
The requirement is as below-
Client selling materials with base unit of measurement is CARTON but needs COPA report CARTON and KG wise. To meet this requirement using BADI, Actual data is coming correctly in COPA report. CARTON and KG(This is additional quantity field 1).
Now the problem with Planning he wants to do planning for both unit if measurement. In KEPM layout i am not able to add Additional quantity field 1 filed(System giving error message).
Please suggest how can do COPA planning in both UOM in KEPM?
Note- Using ACCOUNTING BASED COPA
Thanks,
Chandrasekhar
Hi Chandra
Whats the error message? Unless you tell that it would be difficult..
Also, You can do the Planning in Base UoM and that should automatically convert . Did you check this? Incase this does not convert, can you check if exit COPA006 helps
Regards
Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ajay Anna,
Thank you, Sorry for not detailed the process.
The process is like below.
Requirement- need Plan vs Actual comparison in COPA in CARTON(Base UOM) and KGs (Net weight in material master)
Note- using ACCOUNTING BASED COPA with S/4 Simple fiance.
For actual data no problem using additional quantity 1 field and using BADI (FCO_COEP_QUANTITY) to populate. (This BADI will work for only actual values)
Now problem is planning, in KEPM form i am selecting cost element and Total quantity filed. this will allow me to do planning in one UOM (base unit of measurement)
Now i want to do planning in KGs, if i select additional quantity 1 for same GL account system showing below error message.
Field QUANT1 not known
Message No. KG844
Diagnosis
The planning layout contains the field QUANT1. This field is neither a
value field in your operating concern nor a ratio of two value fields.
Most likely, value fields or ratios were deleted from your operating
concern after this planning layout was created.
Procedure
Remove the field QUANT1 from the layout.
How can i do planning in two UOMs.
Anna, how it will calculate automatically?
If i use COPA0006, in which field it will store, because in table COSP/COEJ there is no additional quantity 1 field.
Thanks,
Chandrasekhar
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.