Rough cut capacity planning for Product group

former_member281216
Participant
0 Kudos

Dear All,

I have created Product group and rough cut capacity planning profile for the product group.

Now how to carry out  the Rough cut capacity planning (T code) for the product group?

Please guide the subsequent steps as I am facing the following problem.

Thanks,

Prasad Inamdar

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

You can use MC94 Planning type  = SOPKAPA then enter your product group and do the rough cut planning.

Best Regards,

R.Brahmankar

former_member281216
Participant
0 Kudos

Hello,

Thanks a lot. T code is MC81

Thanks,

Prasad

former_member281216
Participant
0 Kudos

Hello,

Please tell me about  Aggr.fact. and  Proportion  in brief. I mean what values to be entered in those fields? How these values affect the Planning?

Thanks,

Prasad

Answers (2)

Answers (2)

former_member184574
Active Contributor
0 Kudos

Hi,

Please check the below document.

Thanks

Kumar

Former Member
0 Kudos

Hi Prasad,

Please refer to below link for step by step screenshot. As you are using standard process, so finding solution should not be tough.

http://wiki.scn.sap.com/wiki/display/ERPMan/Rough-Cut+Capacity+Planning+on+SOP

Regards,

Rohit

former_member281216
Participant
0 Kudos

Hello Rohit,

I know the procedure for Rough cut capacity planning for a single material. I need procedure or T code for a Product group. In MC94 when I enter Product group in the material field, system asks for single material. But i want to plan for a product group.

Thanks,

Prasad

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Did you try MC81?

Best Regards,

R.Brahmankar