I have a requirement to have 1 dm package link that has two dm packages, 1 that executes process chain that pulls data from ECC to BW, once that is complete, execute the process chain that loads from BW infocube to BPC. I know that both these dm packages exist and I have created dm package link, but I need to make sure that if ECC to BW process chain fails, the load from BW to BPC doesnt execute. please advise. thanks.
OH Ok, so by default that feature is built in? I thought we had to do something special?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
But if the first package will fail the second will not start... What is the issue?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
16 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.