cancel
Showing results for 
Search instead for 
Did you mean: 

fixed quantity in sales order is treated free

Former Member
0 Kudos

Hello experts,

My requirement is when a sales order line is fixed with a quantity and assigned a batch that stock should not be considered as a free stock.But for if the fix quantity is beyond checking horizon then the stock is considered as free stock. How to change the settings where there is a fix quantity beyond checking horizon that also should be considered as a reserved stock or allocated stock.

Ex:

If an order is fixed with a given quantity based on available stock after checking horizon date the requirement quantity and confirmation are not considered at the time of ATP check by BOP and it is assigning the stock to other orders which are within the horizon date.

For batch# 1003844550 available stock is 110. Total allocations are 143.

In this SO# 102774615/40 is manually fixed and it is beyond checking horizon date.

Thanks,

BK.

Accepted Solutions (1)

Accepted Solutions (1)

babu_kilari4
Active Contributor
0 Kudos

Hello BK,


Your question is quite confusing ? Are you asking - How to dynamically set the Fix date and quantity flag when the order is falling inside the Checking Horizon and when the order is initially outside, you do not want the fix date and quantity flag to be set ?  If the order is outside the checking horizon; technically it wouldn't use the ATP. What is your scope of check EOCH setting ? Is it "No Checking HOrizon " ? or why not use "EOCH confirm at CH" or "No confirmation at EOCH" ?  Explain the business process more clearly.

Thanks,

Babu Kilari

Former Member
0 Kudos

Hi Babu,

Sorry for late response.

ECOH setting is consider CH.

Is there any possible way to consider the requirements which are outside checking horizon.

The users want to reserve a batch for coming 4 or 5 months to a customer and they are fixing it in sales orders. Now issue is the reserved quantity is beyond checking horizon and when new sales order is coming it is not considering the reservations (fix flag) and giving confirmation to the sales order on the given req. delivery date.

Ex: Material: A stock# 100 Batch#A1; CH# 40 days (13/06/2016)

Reservation by fix flag Order (Ord 1): 60 and Req. Delivery Date: (25/06/2016)

New order (Ord2 )came with RDD: 13/05/2016 Qty: 70.

Ord2 got full confirmation on 13/05/2016.

Here the order is not considering the reservation in Ord1.

How to fix this issue.

Thanks,

BK.

Answers (0)