on 04-30-2016 5:18 PM
hI,
I am using standard procurement process visibility scenario but when I am creating PO with confirmation tab specified in ME21N, all messages are going in unprocessed status in EM . Any pointer as how we can solve this issue
Hi Dipak,
When event message to send to SAP EM, it checks event handler exists for that event message tracking id. If not exists then it will be in /SAPTRX/EVM_UNPR.
Take the tracking id of event message from /SAPTRX/EVM_HDR and check event handler presents in /SAPTRX/EH_HDR.
Check the configuration of SAP ECC EM in AOT -> Parameter Setup tab. i.e Refer standard tracking id extractor - PCM10_ITEM.
Regards
GGOPII
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Dipak ,
In case of the standard PCM10 scenario, the testing starts with the creation of purchase requisition with a value in "REQUISITIONER", as mail triggered during GRN to the same, also check the PO document type & Porg you are using.The following are the default parameters for the scenario to work:
PO Doc Type: NB
Purchase Org:0001
Item Category:Blank & No Deletion Indicator
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.