on 05-05-2016 2:18 PM
Hi ,
1. i created PR , and under delivery address tab i kept vendor number and marked check box SC Vendor.
2. PR with Materaial A and qty 100 and delivery date 10.05.2016
3. Run ME2O transaction and pulled my PR and created outbound delivery
Now surprise is
Outbound delivery is having 2 line items ( Material A is repeated) and qty for line items are 56 and 34 respectively
Now question is Why qty 100 is split into 2 line items as 56 and 34.
Would you please suggest any idea.
Regards
Ramakrishnaiah Y
Hi All,
I found the reason..
ME2O...is pulling reservations for same materiel and those are created with different dates .
So delivery is created with multiple line items , each line item belongs to one reservation .
This reason solved my issue.
Thanks for all your support.
Regards
Ramakrishnaiah Y
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Google -> "delivery line item split site:sap.com".
Looks like either batch or storage location are the likely culprits. Or some custom development, check with an ABAPer.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hI Jelena,
Material is not batch managed.
I suspect that if PR and reservation created for the same materail , then run ME20, it picks up both PR and reservation documetns and if we create outbound delivery,then 2 line items added.
Not sure it is just guessing.
Any one please let me know how to create reservation for 541 movement type. i tried in my system using MB21 but getting message
. i googled and come to know not possible, But i saw in my production system reservation created with 541.
Any give idea to create reservation for 542 movement type. So that i create PR and outbound delivery and run ME20.
Regards
Ramakrishnaaiah Y
Adding new questions to the same discussion confuses everyone and makes future search inefficient. Please open a separate discussion for other questions. Although if you've already searched and found existing posts then it might not make sense to keep asking. It seems rather odd that somehow your system doesn't work the same way as others...
Also I'm a bit confused about different user IDs here - what happened to the original user? You might want to sort this out, you won't be able to close this discussion with another user ID.
First of all a transaction ME20 does not exist in SAP, it is ME2O (ohhh). Please try to avoid such errors as it is confusing the readers and posts cannot be found if someone searches with the correct term.
The reservations are autocreated based on the bill of material in your subcontract purchase order, there is no need for a manual reservation, this is then just a double reservation for the same PO
Hi Ramakrishna,
Delivery split due to following reason
1. Different supplying plant or More than one supplying plant.
2. with respect to delivery date/Time - Table : LFDAT
Kindly refer SAP notes:
355404 - Reason for split - Report run for two generated deliveries ( ZLE_ANALYZE_DELIVERY_SPLIT ).
546668 - FAQ: Delivery split when creating deliveries.
Regards,
Vivek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Vivek,
2 deliveries are not created for me .ZLE_ANALYZE_DELIVERY_SPLIT REPORT IS NOT USEFUL.
My Case.
VENDOR,MATERIAL,QTY,SHIP POINT,PLANT, NO BATCH.SAME DELIVERY DATE, NO BOM for this material, i am not using item category L .
Single delivery but 2 line items added for same material and with qty split has happened.
No clue yet.
Regards
Ramakrishnaiah.
Hi,
I have checked LIPS table. except qty,,all field values are similar.
i am not using Sales order as preceding document for outbound delivery.
My Process is
ME51N --Purchase requisition ...-> ME2O. inputs ( vendor,material,plant ) --Inside ME2O..Press button -- Create outbound delivery (me2o pics up PR DOCUMENT)
Regards
Ramkrishnaiah Y
Hi ,
Please check if plant is the reason for the split,
i.e., check if both these two line items have different plant/Payment terms...
Do you input the QTY manually,Check if accidentally you have given wrong inputs
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Yarava,
Please check the Bill of material (tcode CS03) maintained for parent material.
Regards
Simar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi!
Probably you have a batch split here.
Rgds,
Marcio
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please check the delivery item level and find the difference between the two items, other than quantity. This will be the reason for the split. You may check in table level as well - like LIPS - check the same and revert back.
Regards,
AKPT
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.