cancel
Showing results for 
Search instead for 
Did you mean: 

Need help with NWDS Process Composer

Former Member
0 Kudos

Hello guys, I'm really not sure if this is the right place to ask this question so please let me know if it isn't.

I'm using the Netweaver Developer Studio's Process Composer to create a Business Process, the problem I have is I'm trying to link an Activity's Boundary Event to another Subprocess that belongs to a different lane, when I create the subprocess and try to move it to the other lane the system removes the connecting line! leaving the boundary event connected to nothing! here's a screenshot.

The problem is that the Escallation subprocess falls in a different lane (Department) so how do I go about this?

Many thanks.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member191044
Active Contributor
0 Kudos

Hello Rani,

you should use the BPM Space for this issue -->

The screenshot does not work for me. Please check if the url is right.

Regards

Tobias

Former Member
0 Kudos

Hi, here's the screenshot url: 261ea.PNG - imgup.net

Thanks for the reference, I will re-post the question there