cancel
Showing results for 
Search instead for 
Did you mean: 

need advice for process design

former_member186158
Active Participant
0 Kudos

Requirement:

1 Multiple persons sign at the same time

2 Process goes end  when all signed.

3 Anyone can add others into the process, or assign to someone.

4 It is a sub-process.

process diagram(HBDW Approval Sub_Process)

At present, I use parallel split, but it does't run as expected:

Process is compelete, and some task was canceled.

The requirement is reasonable but design is failed

Accepted Solutions (0)

Answers (2)

Answers (2)

junwu
Active Contributor
0 Kudos

1,2 用个loop不久行了吗

3,4要具体信息

Snavi
Active Participant
0 Kudos

just a thought

are you using parallel join or an uncontrolled merge.

if you use parallel split messages in the BPM, you would need to use parallel join so all the events are completed before the process ends

former_member186158
Active Participant
0 Kudos

Thanks for your reply.

As you can see, too many branch,  can't use parallel join any more. I  did test before.