My query regarding LTP scenario. Is it possible for me to use the costing BOM (usage 6) for LTP scenarios? I have tried to use BOM selection ID as 05(first priority to costing BOM) in Planning scenario, also maintained the Scheduling parameter for planned order for LTP. Maintained the production version with costing bom and recipe. But system is creating the planned order only for header material and not creating any planned order for components after Long term planning run (MS02) Please let me know how I can get my BOM exploded to all level if I uses Costing BOM (Usage 6) & selection id as 05 in Planning scenario. Note: It is working fine if I use production BOM for LTP
Hello,
I am facing exaclty the same issue with the costing Bom 6 and the planning scenario using the 05 selection ID.
The system is able to find and select the correct production version with the costing Bom, thanks to the planning scenario but I have a message in MS04 : 52, no BOM found.
Can you help please ?
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Can any one please help on this?
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rupesh,
I have tried that option also.. Still system is not exploding the costing BOM. My production bom is working fine.
Also i tried with maintaiing the Production version and use the BOM explosion method with Production version and gettting the same result as it is not exploding the bom
Thanks
I have created new planning scenario and after saving the new scenario, planning file entry got created but no simulative planned order for dependent material after MS01. (Planned order got created only for Header material).
Rupesh, in standard is it possible to do the LTP for Costing BOM? I doubt because when i use Same setting with bom selection id 01, I am getting the planned order for all level.
Please suggest!
Thanks
Hello
This kind issue should not be raised to SAP as this is a consulting issue, rather than a possible bug of program error on the standard system.
Yes, it is possible to use a costing BOM for LTP.
Make sure that you have checked the following points:
1 - The BOM selection ID includes the BOM usage;
2 - The "production relevant" flag is checked for the BOM item;
BR
Caetano
Hi,
Anupam is right, you must maintain your desired Selection ID in Planning Scenario (T-code: MS31)
regards
Samira
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
What is the MRP type you are using for the header materials.
Regards,
Mahesh.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
You can define the selection id as per your requirement with usage 6 in OS31 and the same can be assigned to Planning scenario in MS31.
Regards,
Anupam Sharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Let me see if I understand you question:
What you are asking is that you want to create dependant requirements (planned orders for lower level materials) with LTP... is that correct?
If so it could a number of different things...
1) Have you checked the box " Also plan unchanged components
in the MRP screen?
2) What is the time horizon for LTP planning?
3) What kind of LTP plan model are you using?
4) are you taking into account existing stock available?
Hopefully this helps,
Alex
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Alex; your understanding is correct!
1. I Ran with settings " Also plan unchanged components" but still same result as it is creating planned order for header materail
2. HOrizon for LTP plannig: If you are talking about the Planning scenario date range, it is ther in well advance.
3. LTP Modle: Can you please clarify?
4. Stock accountability: NO, I am not considerring the stock while running LTP
Please note that if i use bom selection ID as 01 in Planning scenario, BOM is exploding for all level and creating planning order without any issue after LTP run.
Please suggest!
Hello Ritiz,
Is that costing BOM is valid on LTP MRP run date ??
then please the OPPA settings with reference to Plant and BOM / Routing selection ID
then rerun the LTP MRP
Regards,
Venkatesh..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.