Hi
Nproc are backlogs; you can process or delete them by transaction COGI or MF47.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
NProc are the non-process dependent requirements they
can be deleted if your period is open for processing.
the simple method is not to delete but post them by
T-code COGI on zero quantity.
Otherwise they effect on MRP Run and create additional
requirements.
Note: Is there any new in coding from SAP plz let me
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Steve,
You will have to run program for materials... ZINCON_REPROC checking the Del. checkbox...this will remove those NPROC. records which are generated due to incosistency in AFFW and RESB table....
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Steve,
Please see SAP note, SAP Note 901146 : NPROC dependent requirements can not be processed.
Also, below link explains how to remove this inconsistency,
https://wiki.scn.sap.com/wiki/display/ERPMan/Inconsistencies+for+planning+elements+and+display+probl... MD04-Inconsistent“Nproc”dependentrequirement
Please implement the correction programs in your system and then the inconsistency would be cleared.
This works as we had the same problem and fixed it by implementing the correction reports.
Hope this helps.
Best Regards,
Ameya Beri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.