cancel
Showing results for 
Search instead for 
Did you mean: 

Reset NWDI to last active/stable version

Former Member
0 Kudos

Dear All,

We are on SAP NW 7.01 and we have performed some changes to the ESS application and there was an issue with the component and we started having problems with the build.

We wanted to know is there a way we can revert the compartment to a previous stable state and restart with the changes. I tried the "Initialize" option in CBS, but still we are unable to get rid of the errors in NWDS when we import the project.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member189220
Active Contributor
0 Kudos

Hello,

Please reset the affected CBS buildspace as explained here:

(NWDI)(CBS) How to "reset" CBS buildspaces

http://wiki.scn.sap.com/wiki/pages/viewpage.action?pageId=247137217

After deleting it please re-save the development track and re-import the SCAs.

As far as I see you do not have imported a lot of DCs in the CBS so it will not be a problem.

Only if, the build completes without errors please delete and import the track in the NWDS (otherwise there is no point to do it)

Regards,