cancel
Showing results for 
Search instead for 
Did you mean: 

Stock replenishment from manufacturing plant to mother warehouse and from mother warehouse to depot

Former Member
0 Kudos

Details process:

I have 20- depots, 2 – mother house and 1 – manufacturing plant.

We give the forecast (PIR) from depot to mother warehouse, based on requirement (PR)will be generated from mother warehouse to all depots.

Parallel we will define min-max label ( reorder point )at mother warehouse and based on reorder requirement (PR) will generate from Plant to mother warehouse and manufacturing requirement (Plan order) also generate accordingly for manufacturing plant .

How we will mapped the process in SAP R/3 .please suggest.

Thanks

sush

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Caetano,

thanks for your suggestion.

there are two requirement is th be ere in this process.

1. STPR  needs to create from mother warehouse to depot

2. STPR needs to create from manufacturing plant to mother warehouse based on reorder point

3. Plan order needs to be create for manufacturing plant based on min-max level.

please suggest what are the settings to do this include material master .

regards

sush.

solomon_macwan
Active Contributor
0 Kudos

hi Sush,

As suggested by Caetano, use MRP Aread and special procurement 40 for your depot and mother wharehouse. but the limitation is that. for one plant, you can have only one supplying plant.

Or you need to create different storage locations and MRP Area for different supplying plant.

regards,

Solomon

Former Member
0 Kudos

Hi Solomon Macwan ,


there are 5 depot belongs to 1 mother warehouse. we have 20 depot and 4 mother house .


the consolidated (4 -depot ) requirement to a mother warehouse ( 1- mother ware house) is require to create STPR.


parallely based on reorder point STPR will created from manufacturing to individual mother house.

solomon_macwan
Active Contributor
0 Kudos

hi Sush,

create 5 storage location in mother wharehouse. create 5 different mrp area ...and 5 special procurment for each mrp area ...

Regards

Solomon

Former Member
0 Kudos

Hi Solomon,

we have each mother warehouse having two storage location & stock also consider combination of both the storage location .same depot also two storage location each.

regards

sush.

solomon_macwan
Active Contributor
0 Kudos

hi Sush,

please test one scenario and revert.

regards,

Solomon

Former Member
0 Kudos

ok. i will check and come back to you.

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

You need to create an MRP area for each one of those storage locations and create PIRs on the MRP Area Level.

After that you will use a special procurement type, in order to have stock transfers generated by MRP to cover requirements at MRP area level.

On the mother warehouse, you will define a reorder point MRP type (such as VB or V1) and also define a special procurement type to generate stock transfers from the manufacturing plant.

Regards,
Caetano

Former Member
0 Kudos

i am not clear about this. My mother house as well as depot both are define as a plant in sap.

ex - manufcuring plant code - P1

mother house plant code - M1,M2,M3,M4

depot code - D1,D2.up to ...D20.

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

The solution is still the same: Use a special procurement to create stock transfers.

Regars,

Caetano