on 07-05-2007 2:50 PM
Good morning everyone,
We have a data source that gets the data from a table in BI Dev. This table exist in Dev, Q and Production. After I transport this data source to Q, it still has BI Dev as the Source system.
My question is how can the data source use Q as the source system after I transport it? Please explain in detail steps, thank you in advance!
hi Qingbo,
you need to maintain source system mapping
rsa1-tools-source system mapping or transaction RSLGMP in target system (BW Q)
set original source system = BI Dev e.g bwdclnt100
and target source system = BI Q
for r/3 may also needed
set original source system = r/3 Dev
and target source system = r/3 Q
hope this helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you need to map source systems(logical System Name).... in rsa1 --> settings --> assign Logical Systems(if not you could see similar navigation in RSA1).
You need to give source and target Logical system names.
Nagesh Ganisetti.
Assign points if it helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
While transporting, you can convert / switch the source system from Dev to Q and P.
Go to your object in transport connection - edit - convert source system assignment.
Ravi Thothadri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.