on 09-28-2007 1:03 AM
Hi
I am getting multiple goods issue documents for single delivery.
In a order there are 3 line items, and one delivery is created and 3 goods issue documents.
What is the probable reasons for this.
The requirement is for one order with n items there should be one delivery document and one goods issue document.
Inputs requested.
Got solution
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi..
Go to VL02...document flow-See Material Document .
Reward if u finds this as USEFUL...
Regds
MM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Since you havent put the issue in details, I have listed my guessses.
This may be happening due to mainly these three reasons. Please answer them and get back to me.
1) The three Good issue may be happeneing due to split delivery active for the item. If yes then correction should be in the Material master.
2) the availability check scheduled is set in that way. If yes please configure the availability and transfer of requirement.
3) Scheduling of the goods throught that particular shipping point. If yes then please conficgure the shipping tab in Logistic Execution.
Please let me know if the problem persists and award points if solved.
Thanks
Adi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
If there is delivery split, it should create two delivery numbers. Here in my case there is only one delivery and goods issue documents are created as per the number of line items.
Neither availability check nor scheduling is out of scope in the project.
Hope the above description is clear.
Suddu
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.