cancel
Showing results for 
Search instead for 
Did you mean: 

expiration date w/o batch management? (Urgent!!!)

Former Member
0 Kudos

Hi,

how can i use expiration date without batch management?

can anybody tell me about "expiration date check function" (or another way)?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

To check the minimum shelf life in the goods receipt for the PO the following prerequisites must be met:

The shelf life expiration date check must be activated for the plant and movement type in customizing for inventory management under goods receipt--> Set shelf lif expiration date check.

In PO item, make sure the remaining shelf life is maintained. You can enter a default value for the remaining shelf life i the material master record.

Plz go through the below link for futher clarification:http://help.sap.com/erp2005_ehp_02/helpdata/en/a5/63348743a211d189410000e829fbbd/frameset.htm

Reward if useful

Chandru

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Expiration date check is to be used along with batch management.

SLED date is entered or derived from production date at the time of GR for batch managed goods. You have to enter the total shelf life in the material master ( Plant data storage view 1) for using this feature.

You can not use it independently of batch management.

Pavan