Hello Gurus
I am implementing Cost Center Accounting Module. We are using only standard Reports. We have two data sources 0co_om_cca_1 which brings only plan data in to 0cca_c11 cube with full load and 0co_om_cca_9 brings only actual data in to 0cca_c11 cube with delta capable.
My main problem is how to load the data in to cube. As of now we are thing of loading plan data until last period. And then load actual data in to cube. Schedule an infopacakge for actual data every week. How I need to load the plan delta load for every period after full load and how I need to keep that schedule the info package in process chain.
Please give through some light for above with your experience in this module.
Thanks
roopa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks one and all
points allocated
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes, create two process chains as required to load plan data which may be not loaded daily as suggested above.
It was just an example how you can do the loading.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I would define strategy for 2 different Process chains one for Actuals and another for Plan
Actuals is Delta enabled and could be used daily .however plan could be either annual or monthly ,so even if you use meta chain its of no use..Plan(0co_om_cca_1) data which is full load you may not need to delete the prev request as you gonna load it on monthly basis and so there wont be any duplicate records (ex 01/2008 ..02/2008) ,however make sure you use the VTYPE = 20 plan as a filter in the infopackage as other wise it might also get actuals data and your cube will have duplicate records since 0co_om_cca_9 will also get the actuals data.
Hope it Helps
Chetan
@CP..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi roopa,
we are loading the plan data of the whole year each time and deleting the old request by process "delete duplicate requests".
An other (much complicated) solution was to load the plan data first in a DSO/ODS and after that in the cube. So you can reduce the amount of records transfered between DSO and Cube (because the DSO) wurde create records in a change log only for that data that has been changed.
Bye
Frank
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.