MM-SD/ MM-PP integration

Former Member
0 Kudos

what things should be considered for MM-SD/ MM-PP integration

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

PP-MM

1.When you run MRP Planned orders (for both external and internal) will be generated

and also if it is external procured it will generate PRs.

Where ever MRP, availability check, planned order comes it is MM-PP integration

SD-MM

1.Create PR for third party scenario after saving a Sale order.

2.Stock Transport order, subcontracting with delivery

In third party scenario you have to create a sales order with Item category TAS or matl master with genl.item category grp BANS( in basic data1). When u save sales order system automatically generates PR. w.r.t. that PR u will create PO.

Where ever sales order, delivery note, transfer request, customer comes, it means that MM-SD integration is there.

Thanks.

Former Member
0 Kudos

MM-SD:

Basically SD and MM go hand in hand. These are some of the areas of integration

Availability check;

Intercompany STO;

3rd party Order;

Material Master sales views. etc

MM-PP:

MRP(pp)/CBP(mm) related stuff

Material master MRP views

Bill of Materials etc

You can also get a good stugg in sap-img.com

Reward if helpful..

Regards,

Srib