cancel
Showing results for 
Search instead for 
Did you mean: 

mass extension of materials in the plant

Former Member
0 Kudos

Hi friends,

How to extend the mass of materials to the other plants?

Thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You can use LSMW or MM50 or MM17 to extend the Materials to other plant.

rgds

Chidanand

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

U can use LSMW for creating the material master records. Also, U can use MM50 for extending the views in the materail master records. Use MM17 for mass maintenace of the materials.

Reward accordingly , if the answer is found useful.

Regards,

Ramesh

Former Member
0 Kudos

I have a small issue in LSMW.

I want to extend about 4000 Material to a new plant. I am using LSMW to do that. I have used BDC and I have called just three fields Material Number, Plant and Valuation Class. The Plant I have fixed i.e. put the constant number while the Material Number and Valuation Class is picked up from the excel CSV file. However when BDC reaches the stage where it take Plant input, it doesnt do anything neither it picked up the constant. I have tried all the option i.e. Use Constant, Use field from Excel file, Use Fixed Values. No matter what I do, it doesnt pick up the value.

Please help in this, I am really tired of this issue.

Sajid

Former Member
0 Kudos

Hi

you have to use LSMW, to extend material to other plant

or you can also make BDC to extend material to other plants.

Regards,

vijay

pankaj_singh9
Active Contributor
0 Kudos

Hi,

Use MM50 - Extend Material View(s)

MM17 - Mass Maintenance of Materials

OR Use LSMW / BDC