I am going to do Remote client copy from PRD to DEV.

When I run RFC system Comparision option in SCC9 in dev it shows several tables that non existent in PRD while exists in DEV.

So now when I will do copy from PRD to DEV,Will these tables be deleted from dev or they will still be there but will not produce any error during copy.

Please suggest.

Deepak

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Deepak,

Make sure that the source and target systems are at the same support pack level.

Cheers,

Nisch

Former Member
0 Kudos

Hi,

In Test run,I checked that there is 47 GB of data that needs to be copied.

Now I just want to know which tablespace PSAP<SID> or any other I should I extend for this client copy to make this 47 GB available in DEV.

One more thing want to confirm,In Dev i have kernel 640 and in PRD kernel 620.

So should i also upgrade kernel of PRD to 640 or there is no effect of it.

Deepak.

Former Member
0 Kudos

Hi,

Kernel is independent part for client copy, but i suggested you to upgrade the kernel on production server,

kernel 620 is out of maintenance.

for remote client copy check Note 557132 - CC-TOPIC: Remote client copy

47 GB client size is large so you should check Note 489690 - CC INFO: Copying large production clients

regards,

kaushal

Former Member
0 Kudos

Hi Kaushal,

Can you please suggest that how much approx time it will take in completing this 47 GB of client copy.

Deepak.

Former Member
0 Kudos

Hi,

it is difficult to say how much time it's takes for client copy.

regards,

kaushal

Former Member
0 Kudos

Hi Kaushal,

Just suggest me approx time as i need to give to my client.

Deepak.

Former Member
0 Kudos

Hi,

i told you that it's difficult to say the Time.

The database interface limits the throughput to approximately 500MB per hour and process.This means a runtime of 1 - 2 hours for a production preparation client and an even longer runtime

in your case might be it's takes more than 24 hours.

regards,

kaushal

Former Member
0 Kudos

Hi Kaushal,

Thanks for the information.

Just want to confirm one more thing,In Test run I see some tables that does not exist in PRD while exist in DEV.Should i take any action for them.

Deepak.

Former Member
0 Kudos

Hi,

it's due to some of transport request is not transported to production server or both system have different patch level.

if dev and prd have same patch level than you can proceed.

first read Note 557132 - CC-TOPIC: Remote client copy

regards,

kaushal

Former Member
0 Kudos

Hi kaushal,

Yes,That is due to some transport request difference.

I need to do copy of all data from PRD client 999 except the user masters that should be same as earlier in my dev client 333.So i am using the procedure.

First I will create a new client 444 in DEV then remote client copy from 999 to 444 with SAP_ALL then local client copy from 333 to 444 with SAP_USER.

Is it Ok.

Deepak..

Former Member
0 Kudos

Hi,

Yes it's OK.

regards,

kaushal

Former Member
0 Kudos

Hi Kaushal,

Thanks for the suggestions..

Deepak.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

Make sure the precautions check the RFC connection,

Check the client size, If the target client is empty no issue at all,

It will copy without any deletion of tables.

All the best

Cheers

Bhaskar

Former Member
0 Kudos

Hello,

Nothing will be deleted and the copy should work without any problem.

Best regards,