Enterprise Resource Planning Blogs by Members
Gain new perspectives and knowledge about enterprise resource planning in blog posts from community members. Share your own comments and ERP insights today!
cancel
Showing results for 
Search instead for 
Did you mean: 
Former Member

311- movement type reservation against production order is one of the important area in SAP-Production Planning. Reservation is the proposal for transferring material from Raw Store to Production Line against production order. SAP standard provides complete functionality of reservation making against production order.


Let’s open production order of LED (Fert material) with quantity 5


Go to Components:              ( Lets take a simple scenario in which there are just two Raw materials in Fert material BOM)


Let's Check Stock of Both Raw materials

Both materials are present with 200 quantities each in RAW Store. To move this stock into production line, we need to make reservation on production order.

Above pictures show that to produce 5 quantities of LED Fert material, we need following Raw materials in such a way


Material Number

Required Qty.

Receiving location

Issuing location

100000011149

50

1366

1009

100000011150

50

1366

1009


Go to Transaction code  :  MF60


Enter production order number in field :



SAVE IT !!!!!!


HERE IS THE RESERVATION WHICH IS GENERATED THROUGH MF60



YOU CAN POST RESERVATION THROUGH MF65 OR MB1B

20 Comments
Labels in this area