on 10-27-2008 1:57 PM
Hi Guru,
i have few question about the currency.
Problem:
Not able to default the Annual salary currency key at IT0008
1. How to default the 'Annual Salary' currency key at IT0008?
Problem:
My employee basic salary currency is AED but i run the internal payroll driver it calculate using the EUR. My country grouping is 99.
2. How to default the currency key when we run the international payroll driver (RPCALCX0)?
Rewards point will given!
Thank you
Hi chinghwa,
Goto V_T510F_B to assign the pay scale to default currency.
Regards,
Dilek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi friend
If you are working on UAE, the country grouping have to use is 99.
Check with your FI guy that he had assigned the currency AED to your company code. You can view this in table V_T001.
When you define the personel area, do give country as AE in table T500P
You can default your currency as per pays Scale type and Pay scale area in table V_T510F_B selecting country grouping 99.
I hope this will resolve your problem.
Regards
Santhosh.S
Hi All,
To resolve this issue you have to write small payroll function to selet the cuurency from T500C
based on scale type and Pay Scale Area,
and call it from your payroll schema.
Thanks.
Sherif Osman.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi tay,
once check V_T510F_B also...
may be helpful to you.
Regards,
Kitchlu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You have to create a Personnel Area with the code is highest amount the other personnel area.
e.g.
Personnel Area 0001 will sit on top of all the personnel area. Then you assign the country grouping 99 and the company code (currency).
Then you perform payroll run. The payroll with select the 1st country grouping with 99 and check the company code currency.
Hope this is same to your problem.
thanks for reply,
I got that my problem is only in production, i simulate payroll in DEV, amount is going well
I mean no currency conversion
I trace all config. in PROD but no missing conf. in prod from HR point of view
if it is from FI how can I trace
wait for reply
Edited by: Sherif Abdelfattah Osman Elgammal on Nov 25, 2008 11:12 AM
Have you tried Revise Payscale groups and levels. That would deal much with defaulting the currency.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.