on 02-27-2009 6:04 AM
Dear ERP Gurus,
I just encountered problem with STMS in my PRD system. The import is just stuck up on "tp connecting to database". It won't continue unitl the system gives me this error message:
Transport control program tp ended with error code 0232
Errors: connect failed
The tp System log says:
ERROR: Connect to PRD failed (20090227135454, probably wrong environment)
I have verified that the suggestion in SAP Note 165708 has already been implemented in our DEV, QAS, and PRD instances.
Any idea why I am having this problem? Imports were running fine yesterday. Please help.
Your prompt response is highly appreciated.
Thanks a lot.
Best Regards,
Albert
Hi Albert,
First check import monitor and delete all requests from queue, which are still getting imported.
And go to /usr/sap/trans/tmp and mv all those tmp files to other location.
Then kill all OS jobs which are getting execute with tp.
Check all jobs are runnig fine, related to transportation. If not reschedule the same.
Then start importing.
Before doing this just check whether your stms related RFCs are working fine.
I think One of your RFC is getting struck. just try to change ip or hostname accordingly and try.
Regards
Nick Loy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes Albert,
You are right. Issue related to database. But why it is happening?
It is happening because tp is not connecing with your database.
At the same time some of your TMS RFCs also should not work.
Just try to import the same from OS level and let us know the result.
Regards
Nick Loy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.