Hi,

How do you setup Phantom Material in BOM? Do you tag it as Non-stock item "N" or Stock Item "L"? Or it doesnt matter since the "Phantom" characteristic takes over?

Thanks in advance experts!

Regards,

Manoj

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Manoj,

You can go with Stock Item "L" only no problem and the phantom characteristics will take over.

If you maintain "N" then durig MRP it will create a PR for the item. So it is better to maintain "L".

Regards

Suri

Answers (3)

Answers (3)

Former Member
0 Kudos

How do you setup Phantom Material in BOM?

Select the item to which you need to set up as phantom.

go to item overview / basic data view / give the spl procurement key as 50.

Do you tag it as Non-stock item "N" or Stock Item "L"? Or it doesnt matter since the "Phantom" characteristic takes over?

Maintain as stock item L .

anyway it will pass thru the reqmt to the components.

Former Member
0 Kudos

The item is SFG, so in-house production. It needs no PR, but will use "L" to be safe.

Thanks for the inputs!

former_member184655
Active Contributor
0 Kudos

Dear Manoj,

Assign the item category type as L for a phantom material even though the stock cannot be seen at any point in the system for

a phantom material.

Non stock items N will be used for the materials which are specifically purchased for a planned order and will be consumed

immediately.

Regards

Mangalraj.S