cancel
Showing results for 
Search instead for 
Did you mean: 

How to read T511K from PCR based on check date

Former Member
0 Kudos

If I need to put a check in PCR for how to read T511K table based on check date or period start date how could I do that? Answer this will solve my problem

Saurabh Garg

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

resolved

jazib_tariq
Active Participant
0 Kudos

Dear Saurabh Garg,

I also want to know how to enter Constant value in T511k. Currently in my company EOBI Employer Contribution Is hard core in PCR.Ex: If employee contribution is -70 Rs and in pcr multiply wiht -6 its value show 420.How can i enter in table t511k with time period.

Also Payroll posted results.

Thanks in advance.

Regards

Jazib  Tariq

Former Member
0 Kudos

Hi,

If you are using the same constant for multiple period, just adjust your start date and end date of the Constant by delimiting the value.

With Regards

Shyam V

Former Member
0 Kudos

I don't know if I'm getting you right, but usually, you read a Constant from a PCR using the K parameter in the next assignment: AMT=KZCONS. By assigning the value 1 or 0 for differents periods within V_T511K, you can check if you have to continue processing or not.

Regards.