on 03-09-2010 4:40 PM
I am getting the following message:
No requirements were found for the selection criteria
Message no. C#043
What can be wrong? I know it can be quite a lot of different reasons, but have not identified it yet.
Thanking you for input!
1. Have you set the 'Capacity requirements' indicator in the 'Scheduling' block of the network header?
2.That there is work entered for the activity
-3.Check if the Other formula used for capacity category in the work center is filled or not. Test the formula with the values of the work used for the activity. For the PS system, only the forumula 'other formula' is relevant.
4 Check the control key used for the activity. If the control key of activity does not support any capacity requirements planning, the system does not calculate any capacity requirements.
5 Check the status of the activity. Is the activity technical closed or finally confirmed? Finally confirmed or technically closed activities have no longer any capacity requirements.
Check above option. It is always worth while to give T Code where you are checking.
With Regards
Nitin P.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
May be the reason, you havn't check the capacitiy requirements or else check the workcenter wise.
Thanks a lot,
Gujju
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.