Dear gurus,
when we create a production order for a semifinshed material there are reservations created for the raw material used to produce the semifinished material ,what if I what to avoid the creation of material reservation .
I have tried out with setting in opl8 wherein we specify the creation of reservation on release of production order or on creation or never but it is not working otu please if u can help me out.
I what to create manual reservation for production orders......Is it possible?
Thanks in advance.
Dear ,
.As long as , you have BOM components are in stock , system will generate reservation for them when you create Production order where as if any of the component is not available in the stock then it will generate PR based on the material master set up because when you are creating production order or creating planned order through MRP , system performs material availablity check in the back ground and generate either reservation or PR automatically .
Secondly, you can not create Manual Reservation , See the Std SAP message .Message no. M7 126
You entered an order whose category only permits automatic reservations. The following order categories do not allow manual reservations:
10 PP production order
20 network
30 maintenance order
40 batch order (process manufacturing)
50 inspection lot.
So conclusion is you can't stop creation of reseravtion .Curious to know why you do not want reservation for PO ?
Hope this is clear
Regards
JH
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear
I was curious to stop the creation of reservation since In case I am creating a lot of production orders at the starting of the month with different delivery dates there are reservation created for all those production orders what if raw material available in stock gets reserved for all the production orders already created and now I want to create a production order with an earlier delivery date as compared to most of the prod. orders already created .In such a case I should be able to assign the available stock of raw material to the production order having an earlier delivery date so that it could be delivered .
l was asking for an option of manual reservation so that I could create reservation for orders to be delivered earlier manually .
Thanks
hello,
In the Order type dependent parameters in OPL8 you can remove the Tick against this check box Under Purchase requisition Tab
select Option " 1 "
Yes you can in MB21 against Order you can Post reservation
Regards,
jaya Vimal
Edited by: jaya vimal on Aug 8, 2010 6:10 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear jaya,
In opl8 there is setting regarding creation of purchase req. or reservation which gives us an option of creation of reservation on release or on creation or never but inspite of setting it the reservation are created on creation of order.
have you tried creating a reservation for an order created using order category 10 it does not allow to create manual reservation .
Please try and revert back
Thanks
Hi Vinit,
The reservation number is system created ,when you create a order the reservation number is created by system you cant stop it . You can see this reservation number in assignment tab of Production order.
You can create manual reservation against Material .You can not create manual reservation against order .revert back if needed
Regards
Girish
Edited by: girish khobare on Aug 9, 2010 9:16 AM
User | Count |
---|---|
96 | |
10 | |
10 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.