on 10-01-2011 8:19 AM
Hi
i have the error in the production order status like ERTR Error creating transfer reqmnt..where i missed the configuration
i have searched the solution for this error but i cant get clearly ..... Pls suggest me what are the steps after this stage in the
WM-Production
with regards
dinesh
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In the order header (CO02/CO03) use the menu Goto->Logs->WM Material Staging to look for if there any messages when creation of TR..
Kuber
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
i have the error in the production order function-wm material staging-simulatelog-- error called
"No production supply area found for work center"
where i have assign the work centre and production supply area
where i missed the configuration......
with regards
dinesh
Edited by: code acess on Oct 6, 2011 8:45 AM
I suggest you checking system by two ways:
1) Set PSA to work center, now it works? If so please check BOM settings carefully.In the BOM and material master PSA is maintained ?
2) Don't use dynamic production bin, just try a physical bin. If it works please check control cycle settings.
Note: You create the dynamic storage bin "production order" in the control cycle for pick parts. The system then stages all the materials for a specific production order in a dynamic storage bin with this production order number.
When you system emit errors again please use LS24 to check if having a dynamic bin with a production order number.
Kuber
HI Kuber,
i have a doubt in SAP WM PP -PROCESS.
1) I Created the production order
2) i issued the stock to against production order
3) create the transfer order using the TR number
4) production order --change mode ---function -wm material staging -proceed
5) create the Transfer order using the TR
6) After production, i do Goods Receipt using the MB31
pls suggest me , is it right steps....
If wrong means , pls tell me process steps...
with regards
dinesh
Edited by: code acess on Oct 6, 2011 11:39 AM
Edited by: code acess on Oct 6, 2011 12:04 PM
Hi,
Create Prod order
Release order
WM staging
TO from TR
GR for finished goods
http://wiki.sdn.sap.com/wiki/display/SCM/WM-PPInterfaceforPickPartsMaterialStaging
Kuber
Check if your material staging settings are perfect & in particular the "control cycle" maintenance in LPK1.
http://help.sap.com/saphelp_470/helpdata/en/c6/f841704afa11d182b90000e829fbfe/content.htm
Regards,
Bala
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.