12-09-2013 5:10 AM
Hi All,
1. After doing the cost estimation (Easy Cost Planning) for the service line in BOS, the values are not transferred to the Calculated Costs (ISKO to ISK9).
In the pricing procedure VS0000 these conditions are manual conditions. In the document, do we need to maintain them manually?
2. Getting an error 'No Service lines exist that can be costed'. For the outline level 'dummy material' service lines are not maintained.
Thanks & Regards,
K.Rajendra Prasad Rao
12-09-2013 8:48 AM
12-09-2013 8:48 AM
12-11-2013 10:53 AM
Hi Maria,
Thanks for providing configuration document. I checked and found that
1. All the mandatory settings are done, as per the document.
2. We are using cost determination for services, the required mandatory settings are defined.
I am getting the same errors. Please find below the steps I followed.
VA21 --> Create Quotation
Document Type: QBOS
Material: D01
Unit of Measurement: AU (Activity Unit)
Item Category: QBOS
Pricing Procedure: ADBOS1 – Bill of Services
Pricing Procedure for Service Lines: VS0000
Service specifications are created as shown below
Before doing the calculations for cost estimate, if we check the pricing procedure in ‘Analysis pricing’ for the service line, I found that the pricing procedure VS0000 is determined.
Then I did the cost estimate for service line, Costing Variant – PC0X
No Error Log found.
Clicked the ‘back button’ till I reach the service overview screen. Here, I am getting the error ‘No Service lines exist that can be costed’
Now (After doing the cost estimate), if we check again the pricing procedure in ‘Analysis pricing’ for the service line, I did not found the pricing procedure VS0000 as shown below, which was there before doing the cost estimate.
The below screen is not same as before (please check the 2nd image).
No Pricing Procedure...
When I tried to add condition, I got the below F4 options. These conditions are not available in the pricing procedure VS0000. These conditions are defined in MM under External Service Management --> Maintain Conditions for Service.
If I go to the cost estimate and check the errors and come back to the service line overview getting the message ‘The cost estimate has been transferred’. (no changes done in the cost estimate)
But the prices are not transferred.
Incompletion log I am getting the below message:
Thanks & Regards,
K.Rajendra Prasad Rao
12-11-2013 1:58 PM
There are two options to proceed:
01-19-2014 7:59 AM
Hi Maria Miessen,
Thanks for providing the valuable suggestion. OSS message opened and the issue is resolved.
I want to reward with points....don't know how to do. Let me know.
Thanks & Regards,
K. Rajendra Prasad Rao
11-18-2014 5:18 PM
Hi Rajendra,
I am facing the same issue. Can you share the solution for the above problem.
Regards,
JVL
11-24-2014 6:50 AM
Hi Venkat,
Check the Cost Component Structure you are using is active.
Best Regards,
K. Rajendra Prasad Rao