on 03-16-2007 5:07 AM
Hi WF Gurus,
I want to what is the difference b/w Event Linkage(SWE2) and Instance Linkage(SWEINST).In which case an entry is put into the Instance Linkage table.
Regards,
Sapient
Hi,
<i>Event linkage SWE2:</i>
A type linkage must be created if the system is always to react to an event of a particular object type.
If events are used in SAP Business Workflow (as triggering and terminating events, for wait steps), the entries required are made by the workflow system.
Instance Linkage SWEINST:
The instance linkage describes the assignment of a receiver instance to a particular combination of object type, object key and event.
i.e. this type of linkage is to be used when event needs to be raised is concerned with particular instance of an object.
The workflow system defines an instance linkage when work items wait for an event. e.g. Wait step work items
Hope this helps.
Regds,
Akshay
PS : Some points would be nice if it helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
78 | |
9 | |
9 | |
7 | |
7 | |
6 | |
6 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.