on 02-11-2015 2:46 PM
Good afternoon,
I have a slight problem that I am unable to resolve and hope you may be able to help.
I have Planned and Production Orders loaded onto a resource, when I check the resource: periodic view in the Production Planning Table, I can see the orders are loading as required.
If I go into the Detailed scheduling board and open up the Resource Utilization Chart, it is blank.
I have double checked the PDS's and the Resource Master data (capacity profile) and all looks OK, I have tried different DS profiles with no luck.
Am I missing something.
Thanks in advance.
HI Guy Hall
check what is staus of planned order
Regards
Virender
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Guy,
i have the same problem. Do you have a solution right now?
Thanks in advance.
Hi,
if you still have the problem, this note should solve the problem:
Hello Guy,
Are you able to see the resource utilization in the report /SAPAPO/CPDS_REPT?
If yes then you need to set up the configuration for your planning board profile.
Go to the IMG settings, Maintain planning board profiles, select your planning board profile, select chart 5 (Resource Utilization).
Then in the Histogram Data select Resource load to the second, and it should help.
Regards,
Subhash