on 05-29-2015 6:18 AM - last edited on 02-04-2024 1:43 AM by postmig_api_4
Hello Colleagues,
How do I test an expense report with future dates?
Currently, when we create an expense report with future date, there's no amount being reimbursed.
For France, the mileage calculation rates are changed from August. Hence, we need to test the expense reports that can pick the new rates as accordingly to the dates specified.
Could anyone assist here, please?
Thank You!
Best Regards,
Divya
My understanding of system functionality is that you cannot post mileage for the future because theoretically that couldn't have happened. Per diem functionality is the same way; $0.00 for future dates.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Divya R wrote:
Hello Colleagues,
How do I test an expense report with future dates?
Currently, when we create an expense report with future date, there's no amount being reimbursed.
Could you please elaborate on this? What do you mean by "no amount being reimbursed"?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Anton,
Basically, while I create an expense report for future date and claim mileage, the amounts are not calculated. It always shows 0 reimbursement.
Scenario is, there is a change in amount to be reimbursed from August 2015. Hence, iIneed to test if the change in amount is reimbursed for an employee from August.
As mentioned above, if there exists a trip request with future date, the expense report out of this trip request shows the right calculation. I could test the scenario.
Is there any other way to do the testing?
Thank You!
Best Regards,
Divya
Hi Divya,
this is not possible. The system cannot post any expense with future date.
So I don't know what are your requirement with the future date but just change the date to the past.
Normally the testing with travel request is like this. You do a travel request with future date.
When it comes to the expense report just change the dates to the past.
Best regards, Sigi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Siegfried Krause wrote:
this is not possible. The system cannot post any expense with future date.
Let me disagree.
CFTE can very well send to ERP posting date and document date in the future. If posting period is open it'll go through. So the posting can occur in the future unless you have some ABAP code to specifically tweak an IDOC and change i.e. posting date.
User | Count |
---|---|
101 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.