GRAC_SPM_LOG_SYNC_UPDATE jobs are failing

Former Member
0 Kudos

Hi,

We have below jobs in our GRC system that are cancelled due to the following error

"Firefighter log update already running for connector". Can any one help with few inputs to trouble shoot this issue

Regards,

Jitendhar

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hello Jitendhar,

Did you find solution for this issue. We are having same issue in our system.

Would appreciate if you can share the solution.

Best Regards

Ashutosh

former_member297883
Discoverer
0 Kudos

Hi Ashutosh,

Please follow below SAP notes, this resolved our issue

2029368 - EAM Synchronization Jobs Not Completing Resulted in Data Loss

2194569 - AC 10.X EAM : Inconsistencies in the Logs and missing

workflows

Regards,

Jitendhar.

former_member192902
Participant
0 Kudos

Hi Jitendhar,

Please cancell the existing jobs and define new job for SPM log syn update and it will work.

With Regards

Trinadh Bokka

former_member193066
Active Contributor
0 Kudos

Hello,

Please work with Basis Team.

cancel existing running FF log update job which might be in loop.

REgards,

Prasant

Former Member
0 Kudos

could you check the status of the previous instance of the same job. it might happen that, the previous job would have locked the tables, and the subsequent job is trying to update these tables.

This happens due to long run time, of the previous job. eg. run time exceeds the gap between 2 jobs.


So, you can give more gap between 2 runs of this job. Could you share the ST22 error, of this job


Regards

Plaban