TSW - material transfer between Transport Systems

Former Member
0 Kudos

Before dealing with sub-items, please let me know how would a regular nomination look like to transfer material from one TS (intransit plant A) into another TS (intransit plant B), having a commom location LOC.

Now a more complicated scenario.  How do I transfer material from one TS to another using sub-items?

The business scenario is:

- purchased material is received and loaded into barges

- barges go up to a location

- at this location material is transferred to trucks

- trucks go into plant and material is transferred into stock.

Since Modes of Transport are different, I need a TS for the river and another TS for the trucks.

Barges and trucks will be nomination sub-items.  How will the nomination look like (which line items)?

1 ACCEPTED SOLUTION

0 Kudos

Hello Jose Vargas,

For this scenario you would need to create two nominations. One to load the material into TS1 and unload at a location. Another nomination to load into TS2.

For subitem scenario.

Nomination 1.

Line item 1  O - P ( Purchase into transport system ) with subitems which represent the barges.

Line item 2  D - X ( unload at the location ) with subitems

Nomination 2 .

Line item 1 O-X ( Transfer into transport system 2 ) with subitems which represents trucks

Line item 2 D-X  ( Unloading at the plant ) with subitems. 

Regards,

Christina.

.


View solution in original post

2 REPLIES 2

0 Kudos

Hello Jose Vargas,

For this scenario you would need to create two nominations. One to load the material into TS1 and unload at a location. Another nomination to load into TS2.

For subitem scenario.

Nomination 1.

Line item 1  O - P ( Purchase into transport system ) with subitems which represent the barges.

Line item 2  D - X ( unload at the location ) with subitems

Nomination 2 .

Line item 1 O-X ( Transfer into transport system 2 ) with subitems which represents trucks

Line item 2 D-X  ( Unloading at the plant ) with subitems. 

Regards,

Christina.

.


0 Kudos

Thanks Christina!

Let me ask you another question.

I'll peg items 1 and 2 from nomination 1, and 1 and 2 from nomination 2, so I can check if all that was loaded was discharged.  But how do I actually make this check?

I'll also peg item 2 from nomination 1 with item 1 from nomination 2, to check that it was all transferred.  But again, how/when do I make this check?