MRP element Nproc

Former Member
0 Kudos

Hi Gurus,

While creating Pull list for particular material xxx, in the dependent requirements of yyy system is showing one MRP element NProc. Which is also participating in the Net Requirements calculation for the Storage Location & for this Dep Req we are unable to find Header Requirements.

This particular requirement is not getting deleted even after the MRP run & even cannot be deleted manually.

What is the MRP element Nproc?

Srini

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member335796
Active Contributor
0 Kudos

Hi Srini,

There are couple of OSS Notes to address this problem..

OSS Note: 837909 is saying to apply correction instructions in the Note.

OSS Note :633119 may also be useful..

Extract from OSS Note: 901146

=============================================================================

Symptom

Dependent requirements displayed in MD04 with material number followed by the string '/NPROC'. These postprocessing requirements can not be seen in MF47 or COGI and they can not be removed by the reports in note 95307.

Other terms

Stock requirements list, MD04, MF47, COGI, NPROC, postprocessing, planned order

Reason and Prerequisites

Dependent requirement is still linked to an order, however the Production version to the assembly material no longer exists in the system. Check in transaction C223 first to see if the Production Version exists. If it does then this note may not be useful!

Solution

In MD04 you can see in the MRP Element data field the material number that the dependent requirement is linked to, followed by the string '/NPROC'. Take the following steps:

goto transaction MF12 and enter the material and plant, then execute

view one of the entries to see what Production Version is assigned

goto transaction C223 and create an entry for your material, plant and production version assigned in MF12

goto MF47 or COGI and you should now be able to see postprocessing records for your material and plant

correct or remove the postprocessing entries

delete the newly created Production version again

MD04 should no longer display the 'NPROC' dependent requirements

=============================================================================

Hope this helps..

Regards,

Siva