on 07-23-2008 3:29 PM
Dear All,
Can anybody throws light on how the business process of external refurbsihment through maintenance order can be done.
if we specify the control key PM03 service PR would be created and the same cannot be used for subcontarcting process of sending my materail to vendor premises..
Thanks in Advance
Johnson
Hi
Refurbishment - reconditioning the equipment / technical object to meet the desired function.
It is generally used for repairing the motors / pumps / assemblies. This will be handy while managing the inventory. Assume that the plant is having a 15 KW motor of 20 motors. In this case, maintaining a spare.
Pre requisites: Material / assemblies that are to be refurbished are to be activated for split valuation with C as valuation category. There are three standard valuation types are available as follows.
C1 - good or new
C2 - repaired / refurbished
C3 - defective
This is to be maintained in accounting view of material master.
Detailed step for processing a refurbishment order:
Create a refurbishment order type PM04 using transaction IW81
Enter the material number, planning plant
Maintain the work center, planner group and other details like normal Pm orders
Enter the current plant, SLOC and valuation type as C3
Enter the plant in which the repair is to be performed, its SLOC and the valuation type as C2
Process the order and send the material to the plant where the equipment is to be repaired. Award PO if its an external operation.
Repair activity is completed.
Receive the material using transaction IW8W ie GR
TECO.
Settle the order. Please note that the settlement receiver for refurbishment order is Material.
Regards,
E-Jad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Johnson,
For refurbuishment process outside vendor u can have multiple combinations.
1. By making normal subcontracting PR -PO-MIGO u can get the repair cost on material under different valuation category
For more deatils ref link & contact with your MM Counter part
http://help.sap.com/erp2005_ehp_03/helpdata/EN/f4/7d322744af11d182b40000e829fbfe/frameset.htm
2. By making normal service PR -PO-Service Entry sheet u can collect the repairing cost on Cost centre / Maintenance order
3. By making frame work order & making payment by service entry sheet.
4. If u want to prepare subcontact PR though plant maintenance order there is small sub contractor check box tab at operation header level make it on & see your maovement type for reservation gets by default to 541 also u need to change component provide to sub cont at reservation screen.
Further process is same.
Ramesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Guest (ramesh),
Below is one of the reply by you in earlier thread. I could not find that small check box explained by you. Pls tell me where to find that:
4. If u want to prepare subcontact PR though plant maintenance order there is small sub contractor check box tab at operation header level make it on & see your maovement type for reservation gets by default to 541 also u need to change component provide to sub cont at reservation screen.
Further process is same.
Regards
Raj
Hi,
You could use Refurbishment order (standard order type PM04) for this purpose and and process it as an external service using Operations control key PM02. Here is the process
1. Create Refurbishment order for the material
2. Create operations (PM02) for external processing. PReq will be generated once the order is released
3. Send out the material to vendor for repair
4. GR/IR upon receipt of the material from vendor
5. Receive material back to storeroom (IW8W)
6. Order settlement to material
Hope it helps,
PJ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.